LNG station for boat

 

 

 

 

 

 

LNG skid and offloading skid for boat

 

 

» Installed mass meter with skid

» Use vacuum liquild pipe

» Optimized pipline design

» The connection is manily by welding,some by flange

 

Key technology

1. Long distance boat-shore connection,adapt complicated water status

2.barge LNG station use pipe gallery+flexible design method, the offloading distance can reach to 150 meters.

Offloading skid

system configure 2 pumps,the output pipeline use vacuum pipe with vacuum degree less than 5 × 10-3Pa to avoid cool loss. the LNG trail offloading ablity can reach to 30m3/h, can offload at same time by one pump trail or two pump two trails, also can offload by self-supercharge.

 

 

 