CNG compression station pressure regulation and metering

CNG compression station mainly compresses natural gas and provides high-pressure natural gas to CNG transport vehicles/ships/equipment. The general pressure is 20-25MPa. It is widely used for CNG vehicle refueling, which is often called a CNG refueling standard station. If it is used to refuel a CNG tube transport vehicle, it is called a CNG refueling mother station. The process flow of a CNG compression station includes natural gas inlet pressure regulation and metering, purification, compression, storage and refueling, and recovery and release.

CNG filling station

Process flow of inlet pressure regulation and metering

CNG inlet gas pressure regulation

After the inlet natural gas passes through the emergency shut-off valve at the entrance, it enters the pressure regulation and metering process area in the station. The process in the process area is generally filtration, metering, and pressure regulation. The process area is first set up with a main valve (which can also be replaced by an emergency shut-off valve), and a safety valve and a pressure relief valve are set up after the main valve. The safety valve is to prevent the inlet gas pressure from being too high. The safety valve is opened to discharge the overpressured natural gas to the release port. The purpose of the pressure relief valve is that when the equipment in the pressure regulating and metering process area needs maintenance, the residual natural gas in the process pipeline can be manually discharged to ensure the safety of maintenance work.

To ensure the back-end flow meter and pressure regulating device, it is necessary to set a filter device before pressure regulation and metering. The filtration accuracy and design flow of the filter device are determined according to the station design value. To facilitate the determination of the working condition of the filter, it is advisable to set a pressure gauge on the front and rear pipelines of the filter. When the pressure difference before and after the filter reaches a certain value, the filter element needs to be cleaned and maintained in time. Ensure the normal operation of the system. A shut-off valve is set on the main pipeline after filtration to facilitate segmented shut-off during maintenance operations and reduce waste.

Flow meters and pressure regulators

CNG inlet gas metering

CNG inlet gas metering mostly uses volume flow meters, and the measurement unit often uses the volume under the reference state (20°C, 101.325KPa) or the standard state (0°C, 113.15KPa), referred to as the reference cubic meter or standard cubic meter. The metering can be displayed on the spot, or a flow meter with remote transmission to the control room function can be selected according to needs. When the pressure loss of the metering device is too large, the flow meter should be installed in front of the pressure regulator. When the pressure loss is not large, it can be installed before or after the pressure regulating device.

When the natural gas inlet pressure overcomes the pressure loss of the equipment and pipelines before the compressor, if it is still higher than the compressor inlet pressure requirement, a pressure regulating device should be installed. The pressure-regulating device includes a pressure regulator, front and rear valves, and bypass pipelines. When the incoming gas pressure is lower than the required inlet pressure, the bypass valve is opened, the pressure regulating pipeline is closed, and the purification process in the station is directly entered. When the inlet pressure is not higher than the required inlet pressure, the adjustment device can be omitted, but when the incoming gas pressure may increase significantly in the future, the installation position of the pressure regulating device can be reserved.

Adjustment device

CNG stations are generally intermittently produced, so spare pipelines for equipment such as filters, flow meters, and pressure regulators can be omitted. If it is continuous production, spare pipelines need to be set up, and the spare flow rate is not less than 70% of the average hourly flow rate. According to the dual pipeline configuration, the flow rate of each pipeline is not less than 70% of the maximum hourly flow rate. Pressure gauges and thermometers should be installed on the inlet pipeline before and after the pressure regulator, before and after the filter, and before the metering device. The same node position can be used together.