On July 20th, 2024, BLUESKY will receive our esteemed customers, the national gas company from the Middle East. We have arranged a one-week detailed EV charging training course for them.
| Training-BLUESKY EV Charger | ||
| Date | Contents | Presenter |
| 20-21st, JUNE,Thursday&Friday | Operation for each part; | Aftersales: Zhou Guihua |
| 22nd, JUNE, Saturday | Software and payment methods: CMS, APP, VIN to start charging | Software engineer: Zhang Lang、Li Juxia; |
| 24th June, Monday | Parts Replacement, Installation | Aftersales: Zhou Guihua |
| 25th JUNE, Tuesday | Faults diagnose | Aftersales: Zhou Guihua |
| 26th JUNE, Wednesday | Upgrade power and replace connectors | Aftersales: Zhou Guihua |
1. Hardware training course on EV Charging
We provide training lessons on EV chargers for each part of the hardware, such as how each board works, such as the main board, input board, output board, insulation board, PLC board, OCPP board, etc.

For the hardware, our customers have some customized requirements, such as installing an input MID-certified meter to determine the charger’s input electricity. Once they know both output and input electricity, they can determine the station’s efficiency. They are also required to show the efficiency of our Charging Management System back-end office. In the end, after charging for 2 hours, they calculated that our charging station’s efficiency was about 94.5%. This result is brilliant.

Customers also require famous brands for circuit breakers of CHINT, contactors of Dongya, etc. No matter what the customer requires, if we can do it, then we will just do it!
What’s more, the customer also requires robust physical protection for the 7-inch touch user interface(display). This is not a difficult thing for us, we BLUESKY can do everything you imagine.
For the 4-connector EV Charging station, there is a connector binding configured on the device; the length of the connector is 7m, the normal type is 5m, so the cable will not be dragged on the ground.
Customer-guidewire acrylic panels on the surface of high-voltage areas to protect end users from electric shock.
2. Software training course on EV Charging
We have our own APP and backend office to control our charging station. Now, our R&D has developed a new way for authentication, called VIN code. The customer just needs to scan the QR code on the UI display, and then their car will be bound to our management system. From now on, the customer just needs to plug the connector into their car, then wait for about 10 seconds, and the electric vehicle will start charging automatically. We will also complete fCS1 and GBT for this kind of function. For the HAdeMO connector, I cannot achieve this because of the limitation of the protocol.

Moreover, the customer raised some requirements for our backend office; they require a detailed division for fleets, groups, and vehicles on our system.
3. How to extend connector 120KW to 180KW DC charging station?
We teach the customer how to change CCS2 to CCS1, and also how to change CHAdeMO to GBT. It’s a really easy thing to do, just need to prepare the big hexagon wrench to fasten or tighten the big screw.
The customer has ordered 90pcs 120KW DC Charging station, and they would like to extend it to 180KW. For 120KW, we use 4*30KW modules inside the charger; there are 2*30kw will be added to the charger if up to 180KW, so we leave 2 slots for the customer to operate. And make all the components and spare parts compatible for 180KW output. Therefore, the customer only needs to put 2*30 modules into the charger, and then set up the IP address of modules to make all the modules divided into groups as the customer likes.

4. How to diagnose EV Charging failure?
For the faults diagnosed, we make some faults happen again, such as 0X28, which means they didn’t connect to the ground appropriately. Before using the charging station, the customer must check whether the ground wire connects to the charger tightly and correctly.
Finally, the SGS organization people came to our factory to inspect the EV Charging station. They inspected the standby consumption power of the EV Charging station, we connected a meter to the input area, and the result was 19W.
They require that if <50W is okay, so we passed all the inspection items.

So, we passed all the inspections from both our customers and third-party SGS, and they are satisfied with all our hardware and software. Of course, not that the process may go as smoothly as we hope. Anyway, there is also an ancient Chinese poem: The light boat has passed through thousands of mountains. So we see sunshine in the end. We believe BLUESKY Energy and our customers will move forward and lead to a win-win situation together!

Finally, we shipped 100pcs DC EV Charging stations to Ningbo port as the departure port in China successfully!