How to build a standard L-CNG station?

BlueSky: “How to build a standard L-CNG station and the possible problems encountered during construction.” Bluesky’s L-CNG station in Jamaica has officially started operation!

When the morning light of the Caribbean Sea bathed the coastline of Jamaica, the L-CNG station built by the BlueSky team was officially unveiled. This energy station, which embodies the wisdom and hard work of the team, went from the negotiation table to full operation in just 5 months. It not only set a new record for the advancement speed of similar projects in the local industry but also became a new benchmark for energy cooperation between China and Jamaica.

Bluesky’s LCNG station in Jamaica has officially started operation

1. Why choose to open a new L-CNG site in Jamaica?

Reason: Before the launch of the L-CNG project in Jamaica, 200 CNG buses had already been introduced and deployed locally. Considering Jamaica’s land area and the coverage requirements of its public transportation network, the transportation capacity of this scale can already meet the full layout of national public transportation routes. However, there is a significant supply gap in the CNG energy replenishment facilities that go with it, and the density of station layout is insufficient, making it difficult to support the efficient operation of the public transportation fleet.

Solution: Based on this precise market pain point, this L-CNG project adopts a “targeted layout” strategy. The station is directly opposite the CNG bus operation company, providing close-range and targeted energy supply services to the bus fleet. This maximizes the supply efficiency in terms of spatial layout and precisely matches the core needs of end users. Four CNG dispensers with double nozzles are adopted simultaneously, with the longest hose length reaching up to 10 meters. They are distributed at the four corners of this station and can fill up to eight CNG buses simultaneously. The CNG dispensers follow the Nozzle standard of NGV1, with an average flow rate of 7kg/min. The average refueling time for each CNG bus is 10 to 15 minutes.

Add CNG to buses

2. Problems that may be encountered before the entire set of equipment is put into operation

Problem 1: As Jamaica is located on an island and typhoons frequently pass through, the waterproof and windproof performance of the equipment must strictly comply with the protection standards. During the implementation of the project, our BlueSky team encountered Super Typhoon Melisa, with a maximum wind speed of over 17 on the Beautification scale (82 meters per second).

Solution: Conduct an early investigation based on the local conditions and set up more anchor bolt points.

Both the LNG storage tank and the CNG gas storage cylinder group adopt a horizontal structure, which can withstand stronger wind forces.

Problem 2: After a typhoon, water accumulation may occur on the site, which could submerge the LNG pump skid-mounted structure.

Solution: During the site planning stage, set up the predetermined drainage channels, which need to cover the entire site.

Problem 3: The storage boxes for spare parts may get damp or soaked in water, causing the spare parts to rust and become unusable.

Solution: It is necessary to store them uniformly according to the numbers, along with a list of numbers and the quantity of items.

Problem 4: There may be water leakage from the ceiling of the system control room, and the layout of the PLC circuits cannot be distinguished.

Solution: The top of the control room adopts a triangular inclined structure, which makes it easier to guide the circulation of rainwater.

BlueSky’s PLC control system labels each wire with a separate sticker to provide remote maintenance guidance to customers.

Eating, smoking, and piling up miscellaneous items are prohibited in the control room. When leaving the control room, the door must be closed immediately to prevent rats from entering and biting the wires.

CNG refueling tank

3. Problems Encountered in Project Coordination

Problem 1: The unloading hose of the LNG booster vaporizer does not match the connection method of the LNG truck, resulting in leakage.

Reason: The reason is that LNG trucking companies use piston interfaces, which have relatively weak sealing performance.

Solution: Directly cut off the two interfaces and use welding.

Note: At the early stage of project communication, the interface size and sealing method of the LNG truck should be confirmed, and the plan should be configured in advance according to the situation.

Problem 2: The Nozzle of the CNG dispenser does not match that of theCNG bus.

Reason: The reason for the problem is that the customer initially confirmed the NGV1 standard, but the CNG bus that the company is currently refueling is of the NGV2 model. As a result, during the on-site refueling test, the nozzle failed to connect.

Solution: The Bluesky team did not immediately trace whose responsibility it was. Instead, they promptly sought out a supplier for NGV2 for the customer. Since most of the interfaces in China are plug-in type, while those in foreign countries are mostly nozzles for NGV1, there is no NGV2 stock available. Finally, with the joint efforts of both sides, they successfully connected with an American company within five days and personally flew to pick up the goods.

Note: The connection work of the CNG nozzle is the key and the final step of the entire project. It should be confirmed before the start of the entire project. Once confirmed, it is very difficult to change. Although we eventually succeeded in achieving the filling, if it had been agreed from the very beginning that it would be the nozzle of NGV2, our CNG dispenser would also have adopted a larger flow configuration, making the entire filling process more efficient.

CNG dispenser

4. Key Issues Emphasized during the Training Process

Problem 1: Leakage, detection, and maintenance of CNG dispensers

Solution: First, spray soapy water over the entire pipe connection. If there are obvious bubbles, it indicates a leak.

After detecting a leak, first pull down the pull-off valve on the gas filling nozzle side to cut off the supply of CNG gas.

Slowly open the valve at the CNG nozzle to release the gas. The gas release port should face the ground. Do not directly reinforce it with a wrench; the hose may break under high pressure, and the high-pressure gas may spray out and hurt people.

When the pressure gauge shows 0Mpa, slowly unscrew the interface at the connection with a wrench to prevent the residual high-pressure gas from impacting. After all the gas has been completely discharged, wrap the threaded interface with waterproof tape and then tighten it with a wrench.

Problem 2: The temperature of the LNG transported by the local LNG trucking company is -145°C.

Reason: The key to this situation lies in the fact that the temperature of the incoming liquefied natural gas (-145°C) is much higher than that of the standard liquefied natural gas (approximately -162°C). Its main impacts are as follows:

Result: When the saturated vapor pressure rises, the higher the temperature of the LNG, the higher the corresponding saturated vapor pressure, which means that the unloading pipelines and storage tanks need to withstand greater pressure.

When “flash evaporation” gas is produced, and the relatively “hot” LNG enters the extremely cold storage tank, some of the liquid will rapidly vaporize due to intense cooling, generating additional BOG.

Solution: BlueSky sets the safety valve setting value to 1Mpa for the pressure control of the storage tank. When the system shows a pressure exceeding 0.8Mpa, the site staff need to manually relieve the pressure.

Note: Choosing an LNG truck company with pure LNG liquid quality is also very important throughout the entire project.

Problem 3: The weather in Jamaica is quite hot, and the sunlight is intense. The display interface of the gas filling machine needs high exposure.

Solution: We are currently communicating to build a canopy for each CNG dispenser. On the one hand, it can prevent water, and on the other hand, it can also make the display clearer.

Company service personnel explain the functions

Summary: How to build a standard L-CNG station requires:

  • Professional equipment supplier
  • Reasonable planning of the project site in the early stage
  • Precise matching of equipment parameters and dimensions in the middle of the project
  • Professional installation guidance and commissioning training in the later stages of the project
  • Timely feedback and rapid handling in case of project failure

For enterprises that are still in the stage of exploring the national market, the difficulty is extremely great. Choosing a professional supplier can bring about a qualitative improvement to the entire project. Bluesky provides solutions for natural gas energy refueling all over the world. Choose the blue sky, and let’s embrace cleaner natural gas refueling together.

 