Introduction to LNG Tanker Piping and Valve Components

LNG Tanker

As LNG applications expand across the industrial, transportation, and energy sectors, LNG tank trailers have become an essential part of the LNG transportation and supply chain. As a result, standardized and safe operation of LNG tank trailers has received increasing attention.

However, some companies still lack unified standards regarding the functions of LNG tank trailer components, valve operation procedures, and LNG unloading processes.

This article aims to introduce the basic structure and operating procedures of LNG tank trailers, providing reference and guidance for industry users. Because LNG tank trailer designs vary by manufacturer and model, always follow the equipment manual and relevant safety standards during operation.

The content of this article is intended for industry communication and knowledge sharing, helping improve the standardization and safety of LNG tank trailer operation.

Main Piping Components of an LNG Tanker

Main Piping Components of an LNG Tanker

Liquid Inlet/Outlet Connection Flange

The liquid-phase connection is the main passage through which LNG is transferred from the tanker to the storage tank.

During unloading, a hose is used to connect the tanker liquid-phase connection to the storage tank liquid inlet. After the relevant liquid-phase valves are opened, LNG flows into the storage tank by differential pressure or through pressure building.

Features:

  • Transfers cryogenic liquid natural gas;
  • Operating temperature is approximately -162°C;
  • The pipeline must have good thermal insulation performance;
  • The valve must never be opened rapidly to avoid liquid hammer.
Liquid Emergency Shut-off Valve

The liquid emergency shut-off valve is an important safety protection device in the tanker unloading system.

Main functions:

  • Controls LNG liquid transfer;
  • Rapidly stops liquid flow in the event of leakage, fire, or other abnormal conditions;
  • On some tanker models, it can be closed remotely by pneumatic actuation.

During normal unloading: open this valve to allow LNG to enter the unloading line;

In an emergency: close it immediately to stop further LNG outflow.

Bottom Loading Valve

The bottom loading valve is connected to the liquid-phase area at the bottom of the tanker vessel.

Main functions:

  • Controls liquid discharge from the bottom of the tanker;
  • Prevents excessive liquid flow during unloading;
  • Works together with the liquid emergency shut-off valve.

Operating precaution:

  • Open slowly and observe pressure changes.
Top Loading Valve

The top loading valve is connected to the vapor space at the top of the tanker.

Main uses:

  • Gas-phase pressure balancing;
  • Pressure regulation during unloading;
  • Supplying gas pressure to the tanker when necessary.

During unloading, the gas-phase line normally needs to be open so that the pressure inside the tanker remains stable.

Gas Phase Connection Flange

The gas-phase connection is used to connect the tanker gas-phase line to the storage tank vapor return line.

Functions:

  • Balances pressure between the tanker and the storage tank;
  • Improves unloading stability;
  • Prevents unloading speed from dropping due to excessively low tanker pressure.
Pressure Building Liquid Valve

This valve is used to start the tanker’s self-pressure-building system.

After opening:

A small amount of LNG enters the pressure-building vaporizer, is vaporized into gas, and then returns to the tanker vapor space to increase tanker pressure.

Functions:

  • Increases the pressure inside the tanker;
  • Drives LNG out of the tanker more quickly;
  • Improves unloading efficiency.
Pressure Building Gas Emergency Shut-off Valve

This valve controls the return of pressure-building gas to the tanker.

Main functions:

  • Controls the pressure-building circuit;
  • Prevents abnormal pressure rise;
  • Works together with the pressure-building liquid valve.
Pressure Building Liquid Flange

Used to connect the external pressure-building vaporizer line.

LNG enters the vaporizer through this connection, is vaporized into gas, and increases tanker pressure.

Level Gauge

The level gauge indicates the remaining amount of LNG inside the tanker.

Operators use changes in liquid level to determine:

  • The status at the start of unloading;
  • Unloading progress;
  • Whether unloading has been completed.
Pressure Gauge

The pressure gauge is used to monitor the pressure inside the tanker.

During unloading, continuously observe:

  • Initial pressure;
  • Pressure after pressure building;
  • Pressure changes during unloading.

Under normal conditions, tanker pressure should remain stable.

Flame Arrestor

The flame arrestor is installed on the vent line.

Functions:

  • Prevents external flames from entering the tanker;
  • Improves equipment safety.
Vent Line

The vent line is used to release gas.

Typical applications:

  • Depressurization before maintenance;
  • Discharge of residual gas from the pipeline;
  • Release of abnormal pressure.

Do not open it casually during normal unloading.

Gas Overpressure Relief Valve

A safety protection device.

When the pressure inside the tanker exceeds the set value, it:

  • Automatically opens to release gas;
  • Reduces internal pressure;
  • Protects the tanker.

Standard LNG Tanker Unloading Procedure

Step 1: Pre-unloading Inspection

Before unloading, confirm that:

  • The tanker is parked in the correct position;
  • The vehicle is secured, and anti-rolling measures are in place;
  • The grounding cable is properly connected;
  • The liquid-phase and gas-phase hoses are securely connected;
  • All valve positions/statuses have been checked;
  • The storage tank is ready to receive LNG.

Check:

  • Tanker pressure;
  • Liquid level;
  • Storage tank pressure;
  • Whether any valve is leaking.
Step 2: Connect the Liquid-Phase and Gas-Phase Lines

Connections:

Liquid-phase line:

  • Tanker liquid-phase connection
  • Unloading hose
  • Storage tank liquid inlet

Gas-phase line:

  • Tanker gas-phase connection
  • Vapor return hose
  • Storage tank gas-phase connection

After the connections are completed, perform a leak check.

Step 3: Establish Gas-Phase Pressure Balance

First, slowly open:

  • Gas-phase connection valve;
  • Top loading valve;
  • Storage tank vapor return valve.

Allow the tanker and storage tank pressures to equalize gradually.

Purpose:

To avoid sudden pressure changes that may cause:

  • Violent LNG vaporization;
  • Pipeline vibration;
  • Liquid hammer.
Step 4: Start the Pressure-Building System (If Required)

If tanker pressure is insufficient:

Open:

  • Pressure-building liquid valve;
  • Pressure-building gas return valve.

LNG enters the pressure-building vaporizer:

  • Liquid LNG
  • Vaporization
  • Natural gas returns to the top of the tanker

Tanker pressure increases.

Step 5: Start Liquid-Phase Unloading

After confirming that the pressure is stable:

Slowly open the following valves in sequence:

  • Liquid emergency shut-off valve;
  • Bottom loading valve;
  • Storage tank liquid inlet valve.
  • Begin unloading.

Note:

  • Do not open the valves rapidly all at once.

Reason:

Because of the large LNG temperature difference, rapid flow may cause:

  • Pipe contraction;
  • Flange leakage;
  • Liquid hammer.
Step 6: Monitor the Unloading Process

Continuously monitor the following during unloading:

1. Pressure Changes

Tanker pressure:

It should not be too low; otherwise, unloading speed will decrease.

Storage tank pressure:

Prevent it from exceeding the allowable range.

2. Liquid Level Changes

Confirm that:

LNG continues to flow into the storage tank.

3. Pipeline Condition

Check for:

Abnormal frosting;

Leakage;

Abnormal noise.

Step 7: End-of-Unloading Procedure

When the tanker liquid level is close to empty:

Close:

  • Liquid-phase valves;
  • Pressure-building system valves;
  • Vapor return valve.

Then:

  • Release pressure from the pipeline.

Close:

  • Liquid-phase connection;
  • Gas-phase connection.
  • Disconnect the hoses.
  • Install the protective caps on the connections.
  • Unloading is complete.

LNG Unloading Safety Precautions

Never Disconnect Piping While It Is Pressurized

LNG is extremely cold, and residual liquid can rapidly vaporize and generate high pressure.

Valves Must Be Operated Slowly

Especially:

  • Liquid-phase valves;
  • Pressure-building valves.
  • This helps prevent liquid hammer.
Operators Must Wear Personal Protective Equipment

Including:

  • Cryogenic protective gloves;
  • Face shield;
  • Anti-static clothing.

Open Flames Are Prohibited in the Unloading Area

An LNG leak can form a natural gas cloud that may ignite or explode if it encounters an ignition source.

Summary

The core principle of LNG tanker unloading is:

Connect first → equalize pressure → build pressure → slowly open the liquid-phase line → unload steadily → finish safely.

Correctly understanding the relationship among the liquid-phase system, gas-phase system, and pressure-building system is essential for safe and efficient LNG unloading.

For LNG station operators, being familiar with the location and function of every valve and strictly following the standard operating procedure are fundamental to preventing accidents and ensuring long-term stable equipment operation.

Update cookies preferences
WhatsApp

Get a Quick Quote!

x

    Get a Quick Quote!

    x