Bluesky has provided more than 20 cases of Natural Gas Refilling Station solutions for the overseas market (including CNG daughter station, LCNG station, LNG skid). Jamaica LCNG station completed commissioning at the end of November 2025. And started the refilling operation since the commission finished.
Bluesky has provided the LCNG station solution with two sets of LNG storage tanks, two sets of double-pump skids, and two sets of vaporizers. With this design, the station could still keep running even though one LCNG pump was broken.
But the customer urgently contacted us in January of 2026, stating that even though the three LCNG pumps were still running, no LNG was running through the high-pressure vaporizers.

Our after-sales engineers made a video call with the local team immediately, found that the LCNG pumps were frost-free. And our PLC system shows that there is no LNG flow inside the LCNG pumps. This does not meet our equipment requirements. There should be LNG enter the LCNG pumps first before running, otherwise the spare parts inside the LCNG pumps would burn out due to dry running. After the main spare parts inspection, we found the Jamaican customer made an operational mistake. That all system alarms were deactivated led the station to run without an equipment alarm system.

After confirming the main problem, we guided the customer’s engineer to disassemble the LCNG pumps’ cylinder, and found that all the plastic spare parts and bearings were burned out.
We asked the customer to correct the PLC control system immediately and stop using the broken LCNG pumps. The station is running with only one pump.
In our LCNG station design, we separated storage, vaporizer, and refilling into three different areas. With this solution, the refilling area could keep running during the maintenance for vaporizer part. And the station still could provide the service for CNG buses refilling during the maintenance.

Bluesky prepared the spare parts immediately when the situation was confirmed. And booked the nearest flight to Jamaica. The engineers changed the main spare parts for the LCNG pumps, and required the station staff to have new training. Also require to add the on-site equipment inspection to avoid this situation happened again. And the on-site staff have to make sure the PLC monitor&alarm system keeps working.
During this after-sales service, our team spends a short time confirming the maintenance solution, but confirming the problem costs much more time. No one could know that a small maintenance button(this button is only for engineers to do the commission and maintenance; once pressed, the station will ignore all the alarms and keep working) could cause such a big problem and huge cost.

The LCNG station is a low-temperature and high-pressure equipment system, the stuff operation, management, and maintenance training is really important.
As a multi-energy refilling solution provider, Bluesky focuses on both the service and equipment supply. We will provide customers with high-quality and cost-effective equipment. And also offer the best after-sales service and technical support.