1. Factory inspection and maintenance
LNG dispensers are strictly inspected before leaving the factory, and pressure resistance tests, air tightness tests, measurement accuracy tests, and appearance and marking inspections are carried out. However, to ensure their normal operation, they must be properly maintained.

2. Daily maintenance
Daily maintenance personnel must be familiar with and abide by the safety technical regulations and procedures for the operation, maintenance, and management of LNG dispensers; master the working principle and maintenance methods of LNG dispensers, regularly check the use of LNG dispensers, and promptly handle any faults.
Precautions and maintenance:
- After powering on, the small circulation valve should open automatically (except for special settings), and the display should show the data of the last liquid addition.
- Depending on the frosting situation and ambient temperature, try to do less pre-cooling of the large circulation. You can do it more times when the weather is hot.
- The flow meter of the liquid-adding machine is a mass flow meter. It is not a vacuum inside but is filled with inert gas. It will frost after long-term operation. But don’t keep it warm to avoid affecting the accuracy.
- The sealing gasket of the liquid-adding gun is more delicate and expensive. When operating, you must use both hands to apply force evenly, release the pressure first, and then pull it out steadily.
- If there is leakage when pulling out the filling gun, it may be that the inner gasket is broken; if there is leakage during the filling process, it is generally a problem with the outer sealing ring, which is more likely to break than the inner gasket. If the inner gasket is broken, there is a safety risk.
- The life of the sealing ring and the gasket is calculated according to the number of uses, so try to reduce the number of times the filling gun is plugged in and out. When not in use, you can hang the gun on the hook instead of on the gun seat.
- Before repairing the LNG dispenser, the power must be turned off, the LNG dispenser air inlet valve must be closed, and the pressure must be released before the LNG dispenser can be opened.
- After the repair and assembly are completed, the movable parts should be checked for flexibility, and then the air tightness test, the LNG dispenser electronic control part inspection, and the set value inspection should be carried out. Only after passing the test can it be reused.
- The LNG dispenser operation management department should adjust the inspection and maintenance cycle appropriately according to the gas quality and usage conditions, and timely inspect and replace the LNG dispenser seals to ensure a safe and normal gas supply.

3. Maintenance standards
First inspection after one week of operation
- Check the degree of fouling of the LNG dispenser filter;
- Check for leakage at the connection of the LNG dispenser pipe fittings;
- Check for leakage of the LNG dispenser brake valve.
Monthly routine inspection
- Check the wear degree of the gas hose;
- Check the leakage of the LNG dispenser pipe connection and filter:
- Check whether the pull-off valve can work normally;
- Check whether the gas gun valve has self-leakage or external leakage;
- Check whether the LNG dispenser has external force damage.
Regular inspection and maintenance every 3 to 6 months
The maintenance of LNG dispensers is divided into fault maintenance and regular inspection and maintenance. The regular inspection and maintenance time should be determined according to the specific situation. It is related to natural gas quality and cleanliness and LNG dispensers’ reliability requirements.
- Check the LNG dispenser at least once a month.
- Clean and maintain the internal parts of the LNG dispenser at least every six months, and check whether the mechanical pipes have leakage.
- Check the wear and deformation of the pipe parts and replace them if necessary.
The operation management of LNG dispensers should adjust the inspection and maintenance cycle appropriately according to the quality and usage, and check and replace the seals of LNG dispensers in time to ensure a safe and normal gas supply.