The difference between normal LNG Stations and LNG Integrated Skid.

Let’s take a look at the differences between them!
Advantages:
LNG skid-mounted stations significantly save customers’ construction costs. After receiving the equipment, customers can simply commission it and connect it to the power supply for immediate operation, reducing installation time and costs. The system could save transportation costs and easy for relocation operations easier. Expansion can be achieved by adding additional LNG skids, making expansion easy and non-interfering with existing equipment.
Disadvantages:
The skid-mounted system limits the design capacity of the storage tanks, making skid integration impossible. If bunkering volumes increase later, expansion can only be achieved by purchasing new skids.
LNG skid-mounted stations are more suitable for emerging markets. They do not need the professional team for local installation, are easy to commission, and do not require re-insulation and pressure maintenance of pipelines. It can help customers start a business as soon as possible.
Accordingly, an increasing number of long-distance trucks are choosing LNG as a fuel. Using the vehicle’s own pressurized gasification equipment, LNG is directly converted into CNG for use. This is more environmentally friendly and has lower energy costs than diesel.

The demand for LNG bunkering equipment is also on the rise.
Bluesky has also designed integrated skid equipment for emerging LNG markets.
This equipment integrates LNG storage tanks, an LNG cryogenic single pump, an LNG dispenser, an unloading system, a PLC control system, and other details, valves & pipelines into a single skid-mounted station. Component power wiring, pipe connections, pipe insulation, and equipment commissioning are all completed before shipment. Upon receipt, customers only need a flat working surface, a stable and suitable power source, and a brief commissioning training before immediate use.

LNG storage tanks are used to store cryogenic LNG. Customizable to meet customer requirements, they generally do not exceed 60m³, making skid-mounted integration difficult. Customers should calculate tank capacity based on their actual needs and truck unloading frequency. Oversizing LNG storage tanks is not recommended, as any remaining LNG will start the gasification on the third day, resulting in a daily loss of 5% of its remaining capacity over the next three days.
The LNG Cryogenic Single Pump is used to pressurize the LNG and transfer it from the tank to the LNG Dispenser, providing pressure for refueling. The LNG Dispenser, using an LNG electric controller and mass flow meter, performs LNG refueling metering, calculates the refueling volume and amount, and can record the refueling records. The unloading system is used for unloading LNG trucks. Blue Sky’s LNG unloading system uses partial LNG vaporization to pressurize the tanker for unloading, saving equipment costs and operating electricity costs.

The PLC control system monitors the entire LNG skid system and provides automated management. It is connected to leak detection, generating an alarm and disconnecting the power supply to the corresponding equipment if a leak occurs.