Vehicle-grid interaction has many advantages, but it must be said that it also faces many problems.

1. The standard system needs to be improved
My country’s current standards for new energy vehicles and charging facilities have not made effective regulations on V2G functions. The existing standards for power grid connection and metering have not yet considered the application needs of vehicles and equipment with V2G functions. The standard system for V2G aggregation and participation in power trading, such as data interaction, operation control, and information security, still needs to be established and improved. Most of the V2G pilot demonstrations that have been carried out are implemented by enterprises using private protocols and cannot support commercial applications.

2. Investment returns are difficult to guarantee
In terms of cost, because V2G piles have not yet been mass-produced, the price of a 15-kilowatt V2G pile is more than 20,000 yuan, which is 2 to 3 times the price of conventional DC piles with the same power. In terms of revenue, the current vehicle-grid interactive flexibility resources participating in the electricity market are still restricted by many factors. The price mechanism of V2G reverse discharge has not yet been clarified. In terms of participating in the electricity demand response and auxiliary service markets, there are problems such as low participation frequency, few regions, and a lack of effective metering methods for some facilities. At present, in most cases, they can only arbitrage peak-valley price differences by discharging to property units. The revenue model is relatively simple and insufficient to cover the investment and operation, and maintenance costs of V2G piles.

3. Lack of enthusiasm for participation by all parties
- For consumers, they are mainly worried that V2G revenue cannot effectively cover the losses caused by the decline in battery life and safety.
- For car companies, since there is almost no demand for models with V2G functions among consumers, car companies lack the motivation to develop V2G models and design supporting marketing and warranty plans.
- For the power grid, considering that the discharge power of a single new energy vehicle is low, the discharge volume is small, and there are problems of dispersed distribution and difficulty in scheduling and management, compared with energy storage methods such as pumped storage and large-scale electrochemical energy storage, the efficiency of new energy vehicles as energy storage units is relatively low.
The above are some of the problems faced by vehicle-grid interaction.