L-CNG Skid
The major purpose of the L-CNG skid is to pump the LNG liquid through a high-pressure piston pump into the vaporizer, to make it become gas and save it into the cylinder or well, then use a CNG dispenser to refuel the vehicle and transfer the data into the back-office system.
1. Configure 2 pumps that can be used at some time or one as a backup.
2. The special gas separator to avoid pump cavitation.
3. Wind cooling system for the high-pressure vaporizer to make the vapouriser efficiency much higher.
4. System with idle protection to improve the pump lifetime.
Technical performances | |||
Suitable medium | LNG / CNG | ||
Piston pump design pressure | 1.76MPa | ||
Maximum allowable working pressure before plunger pump | 27.5MPa | ||
Piston pump maximum allowable working pressure | 25MPa | ||
Plunger pump flow | 1500L/h/station | ||
Design temperature | -196℃~+55℃ | ||
Pipe design life | 20 years | ||
The normal service life of the pipeline | >10 years | ||
Working power | 3 phase, 380V, 50Hz | ||
Dimensions | 4m (length) x 2.5m (width) x 2.5m (height) |