LNG Station for Boat

 

LNG skid and offloading skid for boat

LNG skid and offloading skid for boat

LNG skid and offloading skid for boat

LNG skid and offloading skid for boat

 

» Installed mass meter with skid

» Use vacuum liquid pipe

» Optimized pipeline design

» The connection is mainly by welding, some by flange

Key technology

1. Long-distance boat-shore connection, adapting complicated water status

2. Barge LNG station uses a pipe gallery+flexible design method, the offloading distance can reach 150 meters.

LNG refueling station for boat

 

Offloading skid

system configure 2 pumps, the output pipeline use a vacuum pipe with a vacuum degree less than 5 × 10-3Pa to avoid cool loss. the LNG trail offloading ability can reach 30m3/h, can offload at the same time by one pump trail or two pumps two trails, also can offload by self-supercharge.

Offloading skid