Regarding CNG refueling station gas storage and extraction

This issue introduces priority control for CNG storage and gas extraction. In addition to the three-stage storage system, there are single- or multi-storage priority controls. The process flow of a single storage control panel is characterized by three-stage pressure priority storage and direct filling with a three-pipe sequential gas extraction system, i.e., a three-zone, four-line system. All operations are based on pressure signals. When a PLC control program is set up, this process can become a multiple-storage control panel, where each stage of storage operation is performed according to a pre-set storage (or replenishment) sequence program. The PLC should allow modification of the program to reflect actual conditions better. Some CNG stations (such as skid-mounted stations or mobile CNG refueling stations) integrate the storage priority control panel and the gas extraction sequence control panel. In this case, a single gas extraction pipeline connects to the refueling machine after the gas extraction sequence control panel.

1. Gas Extraction Sequence Control

The CNG refueling system includes the refueling rate system, the gas extraction sequence system and its control, and the configuration of the gas extraction pipeline.

Gas Extraction Sequence Control

1.1 CNG Refueling Speed System

CNG refueling speed systems are divided into fast refueling and slow refueling, also known as fast charging and slow charging. The refueling speed should be determined comprehensively based on the refueling load (expressed as the maximum refueling volume per unit time), the refueling station’s function(such as whether it supplies gas to external customers), the supply scale, and gas supply security. Generally, CNG stations supplying gas to external customers should use fast refueling. Small stations with lower refueling loads, smaller supply scale, and tight gas supplies should use a combination of fast and slow refueling systems, or slow refueling. CNG mother stations mostly use slow refueling, and their refueling speed is determined by the compressor’s discharge volume. Currently, almost all CNG vehicle refueling stations use fast refueling. The refueling time for each vehicle is 4-6 minutes, which is the time used for fast refueling. Although there is a mandatory regulation that the refueling flow rate of the refueling machine should not exceed 0.25 m3/min (operating state), this is already a sufficiently large flow rate for vehicle refueling.

For rapid gas filling, the following conditions should generally be met:
  • When using multi-stage gas storage pressure and multi-stage gas extraction, the number of stages should not be too many; generally, three stages are acceptable. Too many stages will increase filling time due to frequent switching.
  • When using multi-stage gas extraction, the switching pressure difference between each stage (the difference between the extraction pressure and the pressure inside the gas cylinder when switching to a higher stage after the gas filling speed slows down at any stage) should not be too small; generally, 2 MPa is acceptable. If too small, the low-flow-rate time will be greatly increased.
  • The maximum pressure difference between the extraction pressure and the gas cylinder, especially the initial filling pressure difference, should not be too large. Too large a difference will cause the gas filling to be in a critical flow state and will not further shorten the filling time. If the initial filling pressure difference is too large, it will also increase the throttling temperature drop, affecting the gas filling effect.
  • The volume of the high-pressure stage gas storage equipment should be appropriately large. If it is too small, the compressor must be ready to start direct charging at any time. The above switching pressure difference (or switching flow rate) is preset by the gas extraction sequence panel. The interstage pressure difference is determined and guaranteed by the gas storage scheduling system. Therefore, the gas extraction system should adapt to the gas storage scheduling system, or conversely, the gas storage system should adapt to the gas extraction system.
1.2 Gas Extraction Sequence System and its Control

The gas extraction sequence process is the reverse of the gas storage scheduling system, adopting a sequence from low pressure to high pressure. That is, the lowest pressure level of stored gas is extracted first, and then the extraction is gradually switched to the highest pressure level or even to the compressor direct charging pipe. Currently, most CNG stations use the sequential gas extraction system.

The gas extraction system is completed by the gas extraction control valve group (also known as the sequence control panel). The sequence gas extraction valve group can also be divided into manual control and automatic control (including program control). Automatic control can be classified according to the power of the actuating element, and can be divided into self-operated, pneumatic, and electric types. The manually controlled sequence gas extraction control valve group must be installed separately in the control console or control box. The sequence control panel is generally placed inside the gas dispenser, or it can be combined with the gas storage priority control panel to form a main control panel. Currently, the gas dispenser often has its own integrated gas extraction sequence control panel. In some CNG stations with limited gas storage capacity, where control measures are desired to improve the effective utilization rate of the storage capacity, manual gas intake control technology is also used. The process conditions are three-stage pressure gas storage and three-pipe gas intake, referred to as a three-stage three-pipe system (or three-zone three-line system).

CNG mother station process flow diagram

1.3 Gas Intake Pipe Configuration

Gas intake pipelines refer to pipelines laid from other areas (such as the gas storage area or compression area) to the refueling area (island). Conventionally, they are also called refueling pipes or refueling main pipes. CNG refueling stations can use multi-pipe gas intake or single-pipe gas intake. Multi-pipe gas intake refers to a process where each gas intake sequence control panel is distributed within the refueling machine, and the refueling machine is connected to each pressure-level gas storage device through multiple branch pipes and main pipes of different pressure levels.

The process flow is as follows:

The first end of each pressure-level gas intake main pipe is connected to the respective pressure-level gas storage device, and the last end is connected to the corresponding gas intake branch pipe of the refueling machine. The number of multi-pipes is determined by the number of gas storage pressure levels. Currently, CNG stations with a large number of dispensers often employ a three-pipe gas intake system.

A single-pipe gas intake system involves centrally located control valve groups (sequential control panels) on the control panel (box), with each control valve group connected to each dispenser via a corresponding gas intake pipe.

Its advantages are:

The control valve groups are close to the gas storage facilities, ensuring stable dispensing conditions; it avoids the impact of multi-pipe gas intake on the gas delivery capacity of the main gas intake pipe, facilitating expansion or renovation; maintenance of the gas intake pipe does not affect the operation of other dispensers; and the dispensing structure is simplified. However, when there are many dispensers, the number of gas intake pipes is actually more than with multi-pipe systems. A single-pipe system can be used when the CNG station’s dedicated dispensers (columns) use slow dispensing, or when the station’s supply scale is small, and the number of dispensers is limited. Its process flow is basically the same as that of multi-pipe gas dispensing. The difference is that the gas intake control valve group of multi-pipe gas dispensing is directly connected to the metering device and the gas dispensing gun, while single-pipe gas dispensing requires a longer gas dispensing pipe to connect the gas intake control console (box) and the gas dispenser (metering device and gas dispensing gun).